Projects carried out by MWRI concerning navigation
a)- Damietta Dam & Navigation Lock
b)- Naga Hammady Additional Lock
c)- New Delta Navigation Lock
d)- Additional Esna Navigation Lock
1- Damietta Dam & Navigation Lock
It was constructed to serve the river transportation through the Damietta branch from the river to the sea.
a)- The end of construction: 1989.
b)- Location: 222 Km distant from the Delta Barrages on Damietta branch at 12 Km from Mediterranean Sea
c)- Total cost: 14 Million L.E. & 10.50 Million USD.
d)- Main component :
Navigation Lock: 17 X 150 meters
Spillway: 5 pays, each is 5.25 m wide.
2- Naga Hammady Additional Navigation Lock
a)- The end of construction: 1993.
b)- Location: at the left bank of the current barrage 354 Km D.S. of Aswan Dam
c)- Total cost: 35 Million L.E
d)- Main component :
Navigation Lock: 17 X 150 meters with minimum draft 3 meters.

3- New Delta Navigation Lock
Under the spot of enhancing the efficiency of the navigation & transportation through the River Nile, it was essential to think about constructing a new modern navigation lock to help with the other variant transporting facilities (the rail way and the highway), also with the purpose of upgrading the river navigation line between Damietta Port and Cairo through the Damietta branch.
a)- The construction period: 1996-2003.
b)- Location: 980 Km. D.S. from Aswan Dam at the beginning of Damietta branch.
c)- Total cost: 80 Million L.E
d)- Main component:
Navigation Lock: 17 X 180 meters
4- Esna Additional Navigation Lock project
Why additional lock at Esna ?
1- More than 250 floating hotels are running now between Luxor and Aswan , (there were only 40 floating hotels at the time of construction of the New Esna barrage).
2- More than 100 navigation units pass through Esna navigation lock daily in the winter.
3- The long waiting time especially at Sundays and Thursdays all the year especially at the winter
4- The essential rotational maintenance schedule for the current lock (twice a year)
For all the aforementioned reasons, it was a must to think about constructing a
new navigation lock in order to be dealing with the government policies concerning improvement of the industrial, exporting, transporting and tourism aspects.
a)- Construction period: from mid 2002 to the end of 2004
b)- Location: at the left bank of the current New Esna barrage, 160 Km from Aswan Dam
c)- Total cost: 160 Million L.E
d)- Main component:
Navigation Lock: 17 X 160 meters with minimum draft 3 meters.

Esna Additional Navigation Lock project